Sunday, February 15, 2009

Boeing 787 changes its configuration






On January 28, 2005, the aircraft's development designation 7E7 was changed to the 787. Early released concept images depicted a radical design with highly curved surfaces. On April 26, 2005, a year after the launch of the program, the final look of the external 787 design was frozen, with a less rakish nose and a more conventional tail.
Boeing featured its first 787 in a rollout ceremony on July 8, 2007, at its Everett assembly factory, by which time it had become the fastest-selling wide body airliner in history with nearly 600 orders. Originally scheduled to enter service in May 2008, production has been delayed and it is currently scheduled to enter into service in late 2009.
When 767 sales began to go the way of the Airbus A330-200 in the late 1990s , Boeing began to consider replacement aircraft. As the 747-400 was also beginning to lose traction, the company began to consider two new projects—the Boeing Sonic Cruiser and the 747X. The Sonic Cruiser was intended to achieve higher speeds (approximately Mach 0.98) while burning fuel at the same rate as the existing 767 and A330-200 products. The 747X would stretch the 747-400 and give it a composite supercritical wing to improve efficiency

1 comment: